#5565 Author: nazeem Member Level: Bronze Member Rank: 131 Date: 02/Dec/2011 Rating:  Points: 2 |
I think the power production is less either by less rains or unability to save water during heavy rains.The state government should take necessary steps to save water more efficiently during heavy downpours. The central government should plan the implementation of River Nationalisation Scheme.
|
#5568 Author: Suresh Kumar R Member Level: Gold Member Rank: 20 Date: 02/Dec/2011 Rating:  Points: 2 |
Huge gap between Production of power and demand. Government should take significant steps to increase the production. Day by day demand gets increased but the production is not. That is major problem for power cut.
Priyamudan, Suresh Kumar R. Engal Vazhvum Engal Valamum Mangaadha Tamizh Endru Sangae Muzhanku
|
#5610 Author: vasudevan Member Level: Gold Member Rank: 41 Date: 24/Dec/2011 Rating:  Points: 4 |
Govt should take responsibility as JJ told that she would make electricity cut free Tamil nadu if she is elected to power within three months. But she is not the only one responsible person .One can not produce electricity all of a sudden.It will take time.Our sources of water and thermal are not fully utilised.The windmills produce mor current . but we have no storage infrastructure.The sunbeams arealso not fully used.There should be aplan to produce according to the raising needs.Long term and short term projects should be made.But our rulers are not interested in these issues.People should teach them by street fighting.
|